Corrosion resistance testing is a critical defense against batch failures and warranty claims. When a coating fails on a phosphated steel frame, it can trigger mass returns from high-volume retail partners, damaging both reputation and profit margins on what should be a straightforward promotional product.
This analysis documents the ASTM B117 salt spray test for our phosphated and powder-coated steel. We use this data to verify the baseline rust protection required for promotional-grade outdoor furniture, providing objective validation for every container you source.
What Is a Salt Spray Chamber and How Does It Work?
A salt spray chamber uses a controlled saltwater mist to simulate corrosion. It validates our phosphated and powder-coated steel frames by compressing years of environmental exposure into days.
Simulating Accelerated Corrosion with Salt Fog
The core of the test is straightforward. A 5% sodium chloride solution gets atomized through nozzles, which creates a dense, corrosive salt fog inside a sealed chamber. The chamber maintains a strict temperature of 35°C and a neutral pH between 6.5 and 7.2. This ensures every test is consistent. The process effectively compresses years of potential real-world exposure into a test period that only lasts hours or days.
Validating Our Phosphated and Powder-Coated Steel
We use this test to verify the rust protection on our specific steel components. Our process involves treating the steel with a phosphating acid wash, followed by a protective powder coating. This two-step method provides the basic rust resistance needed for standard outdoor use. We run salt spray tests on every batch to confirm this coating meets our quality standards for corrosion protection before anything ships.
What Does the ASTM B117 Testing Standard Actually Measure?
ASTM B117 measures corrosion resistance in a controlled salt fog. It standardizes test conditions like temperature and salt concentration but does not define pass/fail criteria.
Core Test Parameters and Measurements
The ASTM B117 standard isn’t about passing or failing; it’s about creating a consistent, repeatable environment to accelerate corrosion. It strictly defines the conditions inside the test chamber to ensure results from different labs are comparable. The test measures a material’s response to these exact parameters.
- Chamber Temperature: A constant 35°C (95°F) must be maintained throughout the test.
- Salt Solution: A continuous, atomized spray of 5% sodium chloride (NaCl) solution by mass.
- Solution pH: The collected mist must have a pH level between 6.5 and 7.2, keeping the environment neutral.
- Fog Deposition Rate: The rate at which the salt fog collects must be between 1.0 and 2.0 ml per hour.
How This Test Validates Our Phosphated Steel Frames
For our products, this test is a quality control tool, not a marketing gimmick. Our steel components are treated with a two-layer system: first Phosphating (an acid wash), then Powder Coating. This process is designed to provide basic rust resistance for typical outdoor use.
We use salt spray testing to verify that this combination works as intended. It confirms the coating’s ability to adhere to the metal and protect the underlying steel from the corrosive effects simulated by the B117 standard. This gives us a reliable benchmark for the performance you can expect from our frames in standard environments.
Source 5+ Year Commercial Umbrellas Factory-Direct

Interpreting Results: What Is “Creep from Scribe”?
“Creep from scribe” measures how far corrosion spreads under a coating from an intentional scratch. A smaller measurement means better rust resistance and coating adhesion.
How a Scribe Test Measures Coating Failure
The test is straightforward. A technician uses a tool to cut a deliberate line, or “scribe,” through the protective coating, fully exposing the base metal underneath. This simulates damage like a deep scratch or chip.
That part is then placed inside a salt spray chamber for an accelerated corrosion test, exposing it to a harsh, salty fog for a set number of hours. After the test period ends, the part is removed and cleaned.
Technicians measure how far the corrosion has spread sideways from the original scribe line. The results are rated on a standard scale, like ASTM D1654. On that scale, a perfect score of 10 means there was zero corrosion spread from the scribe line.
The Role of Phosphating in Preventing Creep
We treat our steel components with a phosphating acid wash before applying any powder coating. This isn’t just a simple cleaning step. The process creates a micro-crystalline surface that acts like a primer, giving the powder coating something to grip onto.
This pre-treatment creates a much stronger chemical bond between the raw steel and the final coating. A strong bond is the best defense against creep because it prevents moisture from traveling underneath the coating. When moisture can’t get in, rust can’t spread, and you avoid the bubbling or peeling that signals coating failure.
500h vs. 1000h vs. 3000h: Which Corrosion Rating Do You Actually Need?
For seasonal outdoor furniture, a 500–1000 hour rating is sufficient. A 3000-hour test is for critical, long-term applications in harsh environments and is overkill for promotional products.
| Test Duration | Recommended Application | Cost & Performance Balance |
|---|---|---|
| 500h–1000h | Seasonal umbrellas, promotional furniture, entry-level retail products, non-critical parts. | The industry standard for budget-friendly product lines. Provides satisfactory protection for typical outdoor use. |
| 3000h+ | Long-term installations, marine/coastal environments, critical automotive or aerospace components. | Significantly increases cost and production time. Unnecessary for the promotional market. |
Matching Test Duration to Your Application
The right salt spray test duration comes down to the product’s intended use and lifespan. A 500 to 1000-hour rating provides a solid benchmark for satisfactory performance in non-critical applications. This level of protection is perfectly adequate for items like seasonal umbrellas or promotional furniture that aren’t expected to endure years of harsh weather.
A 3000-hour rating is in a completely different class. This is specified for materials that must perform in long-term service or for critical components where failure would have serious consequences. For the high-volume, cost-sensitive outdoor products market, chasing a 3000-hour rating adds unnecessary cost for a level of durability your customer base doesn’t expect or need.
Our Standard: Phosphating and Powder Coating
As specialists in budget-friendly and promotional outdoor products, our process is optimized for cost-effective performance. We treat all steel components with a phosphating acid wash before applying a durable powder coating. This combination creates a reliable, basic level of rust resistance that is well-suited for typical outdoor conditions.
This method provides the protection needed for seasonal and entry-level product lines without inflating the final unit cost. It’s a practical, proven solution that aligns with the expectations of high-volume buyers like supermarket chains and promotional companies.
Why Is It Critical to Test the Screws, Not Just the Frame?
A quality frame is useless if the screws fail. Fasteners carry the real load, so testing them prevents the entire structure from collapsing at its weakest point.
Fasteners as the Primary Point of Structural Failure
People often focus on the main frame, but the screws and bolts are what actually hold everything together. They aren’t passive connectors; they actively distribute loads and provide resistance against the shear forces trying to pull joints apart. The real-world integrity of any assembly depends entirely on these small components.
You can have the strongest frame material in the world, but it becomes irrelevant if the fasteners holding it together fail. A single rusted or sheared screw can compromise the entire structure. Testing individual fasteners is the only way to replace assumptions with hard data on maximum load capacity and breaking points.
Corrosion Resistance in Hardware: Phosphating vs. Stainless Steel
For budget-friendly and promotional products, standard steel screws rely on surface treatments for protection. Our process uses phosphating (an acid wash) followed by a powder coating. This provides a baseline level of rust resistance that’s suitable for normal seasonal use in standard outdoor environments.
The risk is that any scratch or failure in this coating exposes the raw steel underneath, leading to rust and eventual structural weakness. For products intended for coastal areas or harsher climates, specifying higher-grade materials like 304 or 316 stainless steel fasteners is a critical manufacturing decision. It costs more upfront but prevents catastrophic failure down the line.
ISO 9227: How Does the International Equivalent Compare to ASTM?
ISO 9227 is the global salt spray standard. Its Neutral Salt Spray (NSS) test is equivalent to ASTM B117, but the document also includes more aggressive acid tests.
Scope, Application, and Technical Equivalence
The main difference is scope. ISO 9227 is a single, consolidated global standard that covers three distinct test types: Neutral Salt Spray (NSS), Acetic Acid Salt Spray (AASS), and Copper-Accelerated Salt Spray (CASS). ASTM, on the other hand, separates these into different documents, with ASTM B117 focusing only on Neutral Salt Spray.
For practical purposes, the Neutral Salt Spray (NSS) portions of both standards are considered technically equivalent. The test parameters are nearly identical, so results from an ISO 9227 NSS test are often interchangeable with those from an ASTM B117 test. This equivalence is critical for companies operating in global supply chains, as ISO 9227 is the primary reference standard for salt fog testing outside of North America.
Applying Corrosion Standards to Phosphated Steel Frames
We use these standards to verify the performance of our rust protection system on steel components. The process is a two-step method involving Phosphating (an acid wash) followed by a Powder Coating finish. This combination provides a baseline level of corrosion resistance.
This level of protection is designed to meet the performance expectations for our target market: “Promotional Grade” and seasonal outdoor products. The testing confirms that the finish is suitable for typical use in these applications, aligning with our value proposition of providing cost-effective solutions for high-volume retail.
Why Do We Insist on Testing Every Batch of Powder Coating?
We test every batch to catch inconsistencies in color, durability, and adhesion from raw material or storage issues. This prevents production failures and ensures every frame’s rust protection performs as expected.
Maintaining Consistent Quality and Performance
Any variability between batches of powder can compromise the final product. Raw material sources can change, or storage conditions can degrade the powder before it’s even used. Batch testing is our non-negotiable quality gate to catch these problems before they hit the production line.
This process verifies the core properties of the powder to ensure every production run is identical. We check for:
- Consistent Performance: We verify gel time, particle size, and cure properties match the original specification.
- Formulation Integrity: The tests catch any formulation drift or raw material variations that could cause failures in adhesion or impact resistance.
- Daily Metrics: We confirm that film thickness, uniformity, and final appearance meet our standards for every single run.
Verifying Our Phosphating and Powder Coating Application
Testing isn’t just about the powder itself; it’s about making sure the powder works correctly with our specific production method. For all our steel components, we use a two-step process: Phosphating (an acid wash) followed by Powder Coating.
Batch testing confirms that the coating will perform exactly as needed with this pre-treatment. This step validates three critical outcomes:
- Process Alignment: We ensure the powder’s chemical properties are correctly aligned with our phosphating pre-treatment for a solid bond.
- Expected Rust Resistance: The test validates that the final coated steel provides the basic rust resistance required for standard outdoor environments, just as we specify.
- Proper Adhesion: It confirms the coating bonds correctly to the acid-washed metal surface, preventing future issues like peeling, bubbling, or flaking.
How Can You Request the Salt Spray Report with Your Order?
You can request a salt spray report with your order by providing key test specifications. We facilitate the process with the lab, delivering a report validating our phosphating and powder coating.
Information Required to Initiate a Test
To get a formal salt spray test started, the testing laboratory needs a clear set of instructions. This ensures the test is standardized and the results are relevant to your needs. You’ll need to provide the core parameters for the test setup.
- The exact number of test specimens and their dimensions.
- The required exposure duration, such as 500 or 1000 hours.
- Any specific sample preparation, like scribing the coating per ASTM D1654 to test for creep.
- Defined intervals for visual checks and photo documentation during the test.
Verifying Our Phosphating and Powder Coating Process
The salt spray report isn’t just a piece of paper; it’s objective proof that our anti-rust treatments work as intended. The report validates the performance of our standard phosphating (acid wash) pre-treatment, which is the foundation of our corrosion resistance.
It also provides hard data on the durability of the powder coating applied to every production batch. This documentation gives you the assurance that our steel frames meet the expected durability for seasonal outdoor use, aligning with their intended market position.
Frequently Asked Questions
What is a salt spray test (ASTM B117)?
A salt spray test is a standardized lab method that exposes materials to a controlled, corrosive salt fog. This process, governed by standards like ASTM B117, accelerates corrosion to quickly evaluate the resistance of coatings and metals. A 5% sodium chloride solution is atomized at 35°C, simulating years of harsh environmental exposure in just hours or days.
How many hours of salt spray testing is considered good?
The required duration depends on the product’s application. While basic tests run for 24-96 hours, more demanding uses like marine-grade products often require 500 to over 1,000 hours. It’s a comparative tool, so a ‘good’ rating means a product outperforms others or meets a specific industry benchmark for its intended environment.
Can a salt spray test predict the exact lifespan of a product?
No, the test does not predict a precise real-world lifespan. It is a quality control and comparative tool used to assess relative corrosion resistance under controlled conditions. It helps ensure consistency and compare different coatings, but it cannot perfectly replicate the complex variables of a specific outdoor environment.
What counts as a ‘failure’ during the test?
A failure is identified by visible signs of corrosion or coating degradation. This includes the appearance of red rust on steel, white corrosion on zinc, or the coating blistering, cracking, or peeling away from the metal. On intentionally scratched samples, we measure how far corrosion ‘creeps’ under the coating from the scribe line, which indicates a failure to protect the underlying metal.
Final Thoughts
While skipping batch tests might lower initial costs, our phosphating and powder coating process is a non-negotiable step to prevent rust claims. Verified quality control protects your reputation and eliminates costly product returns. This is the difference between a one-off promotion and a reliable product line.
Don’t guess on quality—verify it firsthand. Request a sample component and the corresponding ASTM B117 test report for your review. Our team is available to discuss your OEM requirements and lock in your production schedule.









